Step 5
After
the first section of hose has been secured within the harness, the second section is wound
and secured the same way by using the upper level hose straps.
Step 6
Firefighter
wearing a fully assembled GNASS pack harness. Within 3-5 minutes a GNASS hose pack is once
again made operationally ready.